Wiki source code of Asbestos calculation (BETA)

Version 2.4 by Robert Jan Daams on 2024/09/17 14:39

Show last authors
1
2
3
4 = Description =
5
6 This calculation flow, in very basic steps, describes the process of doing asbestos research, using the SIBK BRL 2018 and the NEN5707 / NEN 5897 as a guideline. This flow is there to give a basic idea of the processes in asbestos soil research. 
7
8 First, historical research (NEN 5725) has to be done to be able to make an initial strategy for the research plan. Once the fieldworker arrives at the location, a visual inspection of the ground level has to be done, if possible. If the suspicion of asbestos is in a lower layer of soil, e.g. 0,5-1m, there's no need for an inspection.
9
10 After sampling the sample needs to be properly packaged and marked to send towards a lab for analysis. 
11
12 == The calculation ==
13
14 Below you will find the design of the flow of the calculation made based on the Streamline Reporting data format.
15
16
17 [[image:Asbestos 2.0 flow.png]]