| 4 | = Description = | ||
| 5 | |||
| 6 | This calculation flow, in very basic steps, describes the process of doing asbestos research, using the SIBK BRL 2018 and the NEN5707 / NEN 5897 as a guideline. This flow is there to give a basic idea of the processes in asbestos soil research. | ||
| 7 | |||
| 8 | First, historical research (NEN 5725) has to be done to be able to make an initial strategy for the research plan. Once the fieldworker arrives at the location, a visual inspection of the ground level has to be done, if possible. If the suspicion of asbestos is in a lower layer of soil, e.g. 0,5-1m, there's no need for an inspection. | ||
| 9 | |||
| 10 | After sampling the sample needs to be properly packaged and marked to send towards a lab for analysis. | ||
| 11 | |||
| 12 | == The calculation == | ||
| 13 | |||
| 14 | Below you will find the design of the flow of the calculation made based on the Streamline Reporting data format. | ||
| 15 | |||
| 16 | |||
| 17 | [[image:Asbestos 2.0 flow.png]] |