Wijzigen voor document Asbest berekening via rapportage (BETA)
Laatst gewijzigd door Robert Jan Daams op 2024/09/20 14:31
Van versie 2.3
gewijzigd door Robert Jan Daams
op 2024/09/12 18:04
op 2024/09/12 18:04
Opmerking bij wijziging:
Er is geen opmerking bij deze versie
Naar versie 2.6
gewijzigd door Robert Jan Daams
op 2024/09/17 14:43
op 2024/09/17 14:43
Opmerking bij wijziging:
Er is geen opmerking bij deze versie
Samenvatting
-
Paginaeigenschappen (2 gewijzigd, 0 toegevoegd, 0 verwijderd)
Details
- Paginaeigenschappen
-
- Titel
-
... ... @@ -1,1 +1,1 @@ 1 -Asbest oscalculation(BETA)1 +Asbest berekening via rapportage (BETA) - Inhoud
-
... ... @@ -1,19 +1,11 @@ 1 1 2 2 3 3 4 -= Description =4 += Beschrijving = 5 5 6 -This calculation flow, in very basic steps, describes the process of doing asbestos research, using the SIBK BRL 2018 and the NEN5707 / NEN 5897 as a guideline. This flow is there to give a basic idea of the processes in asbestos soil research. 7 7 8 - First,historical research(NEN 5725) has tobedone to be able to make an initial strategy for the research plan. Once the fieldworker arrives at the location, a visual inspection of thegroundlevel has to be done, if possible. If the suspicion of asbestos is in a lower layer of soil, e.g. 0,5-1m, there's no need for an inspection) The process of an asbestos inspection is explained in 1.17 +== De berekening == 9 9 10 -After the field inspection, an hole needs to be drilled. There are two types of inspection holes in asbestos research, an asbestos inspection hole (usually 0,3m in diameter, x 0,5m in depth) for explorative research and an asbestos trench for further research (usually 0,3m wide, at least 200cm long but this can differ depending on the research location / research plan!). The process of sampling asbestos is explained in more detail in section 1.2. 11 11 12 -After sampling the sample needs to be properly packaged and marked to send towards a lab for analysis. 13 13 14 -== The calculation == 15 - 16 -Below you will find the design of the flow of the calculation made based on the Streamline Reporting data format. 17 - 18 - 19 19 [[image:Asbestos 2.0 flow.png]]