Changes for page Asbest berekening via rapportage (BETA)
Last modified by Robert Jan Daams on 2024/09/20 14:31
From version 2.3
edited by Robert Jan Daams
on 2024/09/12 18:04
on 2024/09/12 18:04
Change comment:
There is no comment for this version
To version 2.1
edited by Robert Jan Daams
on 2024/09/12 17:09
on 2024/09/12 17:09
Change comment:
Uploaded new attachment "Asbestos 2.0 flow.png", version {1}
Summary
-
Page properties (3 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,0 @@ 1 -Asbestos calculation (BETA) - Parent
-
... ... @@ -1,1 +1,0 @@ 1 -test.WebHome - Content
-
... ... @@ -1,19 +1,0 @@ 1 - 2 - 3 - 4 -= Description = 5 - 6 -This calculation flow, in very basic steps, describes the process of doing asbestos research, using the SIBK BRL 2018 and the NEN5707 / NEN 5897 as a guideline. This flow is there to give a basic idea of the processes in asbestos soil research. 7 - 8 -First, historical research (NEN 5725) has to be done to be able to make an initial strategy for the research plan. Once the fieldworker arrives at the location, a visual inspection of the ground level has to be done, if possible. If the suspicion of asbestos is in a lower layer of soil, e.g. 0,5-1m, there's no need for an inspection) The process of an asbestos inspection is explained in 1.1 9 - 10 -After the field inspection, an hole needs to be drilled. There are two types of inspection holes in asbestos research, an asbestos inspection hole (usually 0,3m in diameter, x 0,5m in depth) for explorative research and an asbestos trench for further research (usually 0,3m wide, at least 200cm long but this can differ depending on the research location / research plan!). The process of sampling asbestos is explained in more detail in section 1.2. 11 - 12 -After sampling the sample needs to be properly packaged and marked to send towards a lab for analysis. 13 - 14 -== The calculation == 15 - 16 -Below you will find the design of the flow of the calculation made based on the Streamline Reporting data format. 17 - 18 - 19 -[[image:Asbestos 2.0 flow.png]]