Changes for page Asbest berekening via rapportage (BETA)
Last modified by Robert Jan Daams on 2024/09/20 14:31
From version 2.2
edited by Robert Jan Daams
on 2024/09/12 17:12
on 2024/09/12 17:12
Change comment:
There is no comment for this version
To version 2.3
edited by Robert Jan Daams
on 2024/09/12 18:04
on 2024/09/12 18:04
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -3,8 +3,14 @@ 3 3 4 4 = Description = 5 5 6 -T erraIndex offersan asbestoscalculation basedonanalysis data,according toBRL2018/NEN5707.6 +This calculation flow, in very basic steps, describes the process of doing asbestos research, using the SIBK BRL 2018 and the NEN5707 / NEN 5897 as a guideline. This flow is there to give a basic idea of the processes in asbestos soil research. 7 7 8 +First, historical research (NEN 5725) has to be done to be able to make an initial strategy for the research plan. Once the fieldworker arrives at the location, a visual inspection of the ground level has to be done, if possible. If the suspicion of asbestos is in a lower layer of soil, e.g. 0,5-1m, there's no need for an inspection) The process of an asbestos inspection is explained in 1.1 9 + 10 +After the field inspection, an hole needs to be drilled. There are two types of inspection holes in asbestos research, an asbestos inspection hole (usually 0,3m in diameter, x 0,5m in depth) for explorative research and an asbestos trench for further research (usually 0,3m wide, at least 200cm long but this can differ depending on the research location / research plan!). The process of sampling asbestos is explained in more detail in section 1.2. 11 + 12 +After sampling the sample needs to be properly packaged and marked to send towards a lab for analysis. 13 + 8 8 == The calculation == 9 9 10 10 Below you will find the design of the flow of the calculation made based on the Streamline Reporting data format.